home
services
projects
contact
employment
Anadarko Logo Genghis Khan Logo
 

Anadarko: Genghis Khan

Subsea Production System Operating Manual Initial Production Start-Up Manual

Asset Details:

The Genghis Khan is located in a water depth of 4,300 feet on Green Canyon Block 652, was drilled to a total depth of about 26,000 feet. First production is expected in 2006 through subsea tieback to the Marco Polo platform, located 2.4 miles from the discovery. Anadarko has a 100 percent working interest in the block.

Project Details:

GATE, LLC is presently contracted to develop the Genghis Khan Subsea Production System Operating Manual and Initial Production Start-up Manual.
Genghis Khan
Genghis Khan Map Specific activities include the following:
  • Develop Subsea Operating Procedures.
  • Coordinate the review of the Subsea Operating Procedures.
  • Liaise with the Topsides Operating procedures to ensure consistency across interfaces.
  • Develop Initial Well and Flowline Start-up Plans.
  • Provide Initial Start-up Support during execution of the subsea system start-up processes.